Search
Choose Type:
Message:
> More    
City News
Shantou planning for urban rail transit network
Date: 2015-11-02      Source:

"Shantou urban rail transit network planning" (Exposure draft) prepared by China Railway Engineering Consulting Group Co., Ltd. which is commissioned by Municipal Transportation Bureau, was recently released in its official website for public consultation.

The long-term program of the Planning consists of 8 lines with a total length of 201.6 km; the short-term program consists of two lines -Phase I of Line 1 and Phase I of Line 3, with a length of 44.3 km.

The 2020 line network recommended program consists of Phase 1 of Line 1 and Phase I of Line 3, with a total length of 44.3 km, 31 stations and one transfer station. The 2030 recommended program based on the line network in 2020, implements Phase II of Line 1, Phase II of Line 2 and Line 3. After completion, the total length is 100.5 km, with 61 stations and 3 transfer stations.
 

Source:Shantou Daily, Nov 2, 2015




汕头规划建设市域轨道交通线网


  由市交通运输局委托中铁工程设计咨询集团有限公司研究编制的《汕头市市域轨道交通线网规划》(征求意见稿),近日在该局官网公示,征询公众意见。
  规划远景方案由8条线路组成、全长201.6公里;近期方案由1号线一期与3号线一期2条线组成,线网长44.3公里。
   2020年线网推荐方案由1号线一期与3号线一期2条线组成,线网总长44.3公里,设站31座,换乘站1座。2030年线网推荐方案在2020年线网基础上,实施1号线二期、2号线及3号线二期。建成后线网总长100.5公里,设站61座,换乘站3座。

来源:汕头日报2015-11-2 

 
Copyright by The People's Government Of Shantou City. All Rights Reserved.
  Contact Us
--