Search
Choose Type:
Message:
> More    
City News
A Total of 7.5 Billion Yuan will be Invested in the Shantou Haibin Road West Extension Project
Date: 2020-05-26      Source: Shantou Daily

Recently, Shantou released the feasibility study report for the new project of the waterfront promenade and parking lot in the Niutianyang Area (west extension of the Haibin Road) before the approval.

According to the public announcement, the project is located around the current intersection of the Zhaoshang Road of the Haibin Road. After the route crosses the Xidi intersection to the west, it will cross the north side of Shantou Xidi Park and the Queshi Bridge, and will connect with the Queshi Bridge. Then the route will cross the Meixi River and connect the Niutianyang Area along the embankment. After intersecting with the plane of the auxiliary road of the Niutianyang Fast Track under construction, it will be arranged along the embankment, and the end will extend westward to the bottom of the high-speed bridge of the Chaozhou-Shantou Loop Expressway. The technical standard of two-way six-lane way of the urban trunk road will be adopted in the west extension of the Haibin Road. The Xidi area will be constructed with interconnected hubs and underground parking lots; the construction period of the project is 3 years, with a total investment of 7.5 billion yuan.

Source:Shantou Daily, May 26, 2020


汕头海滨路西延工程拟总投资75亿

   近日,我市发布牛田洋片区海滨长廊及停车场新建工程(海滨路西延)可行性研究报告审批前公示。

  按照公示,该项目位于海滨路招商路口附近对接现状海滨路,路线往西跨越西堤路口后,在西堤公园北侧穿过,上跨礐石大桥并与礐石大桥互联互通后,跨越梅溪河连接牛田洋片区沿大堤布线,与建设中的牛田洋快速通道辅道平面交叉后,继续沿大堤布置,终点向西延伸至潮汕环线高速桥底。海滨路西延将采用双向六车道城市主干路技术标准,西堤片区将建设枢纽互通及地下停车场;项目建设工期为3年,拟总投资75亿元。

来源:汕头日报2020-5-26



 
Copyright by The People's Government Of Shantou City. All Rights Reserved.
  Contact Us
--