
Recently, the construction of Phase I Project of the high-profile Nan'ao Connection Line was started, which will add an east-west artery of communications in Chenghai District and open up a fast track between Nan'ao Bridge and the expressway.
Nan'ao Connection Line is an additional connection line constructed in accordance with the Guangdong Province Expressway Network Planning (2020-2035). It is a major initiative of Guangdong provincial committee of the CPC and Guangdong provincial people’s government to support Shantou to construct a high-level national comprehensive transportation hub. Nan'ao Connection Line Project will be implemented in phases in accordance with the technical standards of both first-class highway and urban road. The first phase of the Project (the project between National Highway G539 Line Lianyang Bridge and Nan'ao Bridge) is located in Chenghai District. It adopts a standard two-way 6-lane highway section and slow-moving system. The design speed of the main line is 80 km/h, and three overpasses and four pedestrian bridges are designed.
Source:Shantou Daily, Dec 12, 2021
汕头南澳联络线一期工程启动建设
近日,备受关注的南澳联络线项目一期工程启动建设,将为澄海区新增一条东西向的交通大动脉,并打通南澳大桥对接高速公路的快速通道。
南澳联络线为《广东省高速公路网规划(2020-2035年)》规划建设的加密联络线,是广东省委、省政府支持汕头建设高水平全国性综合交通枢纽的重大举措。南澳联络线项目按一级公路结合城市道路技术标准分段分期实施。一期工程(国道G539线莲阳大桥至南澳大桥工程)位于澄海区,采用标准双向6车道公路断面加慢行系统,主线设计速度80公里/小时,并设3座跨线桥和4座人行天桥。
来源:汕头日报 2021-12-12