Search
Choose Type:
Message:
> More    
City News
The First Piling of the Longhu Section of the East Guangdong Intercity Railway is Started
Date: 2023-05-26      Source: Shantou Daily

图片2.png

Recently, the first piling of the extradosed cable-stayed bridge of the East Guangdong Intercity Railway across the Xinjin River was successfully started, marking that the major part of the Bridge has entered the substantial construction stage.


The total length of the “One Ring, One Ray” line of the East Guangdong Intercity Railway is 140 kilometers, of which Shantou Section is 53.5 kilometers. The total length of Longhu Section of the East Ring Line is 10.72 kilometers, and the total length of the link line is 1.73 kilometers, with a total construction cost of RMB 1.609 billion. The construction was started on October 30 last year and is planned to be completed by the end of April 2027, with a total construction period of 54 months. Among others, the section from Waisha Station (where the extradosed cable-stayed bridge crossing over the Xinjin River is located) to Longhu Station Grand Bridge crosses over the Xinjin River, and it is an important node in the Longhu Section of the East Ring Line of the East Guangdong Intercity Railway.

Source:Shantou Daily, May 26, 2023


  粤东城际铁路龙湖段主体工程首桩开钻

  近日,粤东城际铁路跨新津河矮塔斜拉桥首桩顺利开钻,标志着该桥主体工程进入实质性施工阶段。

  粤东城际铁路“一环一射线”线路总长140公里,其中汕头53.5公里。东环线龙湖段长10.72公里,联络线全长1.73公里,总造价16.09亿元,于去年10月30日开工,计划2027年4月底竣工,总工期54个月。其中,新津河矮塔斜拉桥所在的外砂站至龙湖站特大桥,上跨新津河道,为粤东城际铁路东环线龙湖段重要节点。

来源:汕头日报 2023-5-26


 
Copyright by The People's Government Of Shantou City. All Rights Reserved.
--